France
Beauvais
2013
Worldwide
This rebuild of the Pont de Paris in Beauvais city centre features an orthotropic deck on two main box-girders with a variable section containing four bays. It is 120 m in length. The decision to choose steel rather than concrete for the entirety of the bridge enabled the old piers to be maintained. It also future-proofed the structure against possible increases in traffic load.
Conceptors
INCA, INGENIEURS CONSEILS ASSOCIES SARL
info@inca-ing.lu
andrea.decillia@inca-ing.lu
www.inca-ing.lu
T. +352 42 68 90 1
ATELIERS ROGER ONCIN
consulting engineer in other disciplines
Client
City of Beauvais
Cost
6 100 000 EUR