Burkina Faso Pabré Department 2009 - 2012 Worldwide This facility is used to study, test and supervise the drinking water supply works in the villages of the Pabré local authority in Burkina Faso. The work provided: - three drinking water supply facilities in Pabré centre, Pabré St. Joseph and Katabtenga - seven simplified drinking water supply facilities in Bendatoega, Bilgo, Goupana, Nedego, Sabtenga, Salle and Zouma - 11 small and medium hydraulic facilities in Bidougou, Bigtogo,Dabaré, Gaskaye, Koankin, Kodemtoré, Napamboumbou, Sag-Nioniogo, Wavougué, Yamba and Zibako. Conceptors TR ENGINEERING SA e-mail@tr-engineering.lu www.tr-engineering.lu T. +352 49 00 65 1 Client Municipality of Pabré Cost 1 907 543 EUR Share this project Drinking Water supply Pabre © OAI 2017 Location Drinking Water supply Pabre © OAI 2017