Benin Cotonou 2007 - 2011 Worldwide This project includes controlling and surveying construction and reconstruction work of the north-west road exit from Cotonou, the economic capital of Benin. This is part of the construction work of the urban area drive through in the city between Porto Novo and Ouidah Abomey-Calavi. The work undertaken was extremely varied, and included converting road sections into high-density urban areas, side path construction work, setting up culvert crossings, and doubling the capacity of the Godomey Bridge. Conceptors TR ENGINEERING SA e-mail@tr-engineering.lu www.tr-engineering.lu T. +352 49 00 65 1 Client Ministry of Finance - Public Works Department - Benin Cost 39 616 000 EUR Share this project Reconstruction works Cotonou © OAI 2017 Reconstruction works Cotonou © OAI 2017 Reconstruction works Cotonou © OAI 2017 Location Reconstruction works Cotonou © OAI 2017 Reconstruction works Cotonou © OAI 2017 Reconstruction works Cotonou © OAI 2017